Visa Bulletin

April 2019 Visa Bulletin

Both family-sponsored and both employment-based tables, every cell with its change from the Mar 2019 bulletin. A cutoff links to that line's own tracker.

Read from the Department of State's April 2019 Visa Bulletin (PDF fingerprint a5ce804ae103), parsed twice by different programs and hand-checked. This is the bulletin for fiscal year 2019. Sources and method.

Your line in the April 2019 bulletin

Pick your category to see its two cutoffs in the April 2019 bulletin, what changed, and which one an I-485 filed this month goes by. Country means country of birth; most countries are All other countries.

For Apr 2019 adjustment of status filings, USCIS designated the Dates for Filing chart for family-sponsored categories and the Final Action Dates chart for employment-based categories (USCIS, read Oct 23, 2026; every month since October 2016).

What moved in the April 2019 bulletin

Compared with the Mar 2019 bulletin. Final Action Dates: of 81 cells, 41 moved forward, 0 moved back, 26 did not change and 14 switched between a date and Current or Unavailable. Dates for Filing: of 73 cells, 32 moved forward, 0 moved back, 41 did not change and 0 switched between a date and Current or Unavailable.

Every line that moved

One row per line; countries that printed the same two cutoffs share a row. The full tables below have every line.

LineFinal ActionDates for Filing
F1 rest of world, China and IndiaDec 1, 2011+40 daysJul 1, 2012+2 months
F1 MexicoAug 8, 1997+7 daysOct 1, 1999+9 days
F1 PhilippinesApr 8, 2007+7 daysApr 8, 2008+7 days
F2A rest of world, China, India and PhilippinesMar 1, 2017+2 monthsDec 15, 2017+7 days
F2A MexicoFeb 15, 2017+2 monthsDec 15, 2017+7 days
F2B rest of world, China and IndiaOct 22, 2012+3 monthsJul 1, 2014+9 days
F2B MexicoDec 1, 1997+2 monthsJul 1, 1998+5 months
F2B PhilippinesAug 1, 2007+10 daysMar 1, 2008+39 days
F3 rest of world, China and IndiaSep 22, 2006+14 daysApr 22, 2007+2 months
F3 MexicoFeb 8, 1996+24 daysJun 15, 2000+7 days
F3 PhilippinesJun 1, 1996+5 monthsSep 1, 1997
F4 rest of world and ChinaJan 1, 2006+3 monthsAug 1, 2006+40 days
F4 IndiaJul 15, 2004+7 daysFeb 15, 2005+7 days
F4 MexicoFeb 8, 1998Nov 15, 1998+7 days
F4 PhilippinesJun 1, 1996+5 monthsJan 15, 1998+7 days
EB-1 rest of world, El Salvador, Guatemala and Honduras, Mexico and PhilippinesFeb 1, 2018+31 daysJun 1, 2018
EB-1 VietnamFeb 1, 2018+31 days-
EB-2 ChinaApr 1, 2016+3 monthsJul 1, 2016+2 months
EB-2 IndiaApr 12, 2009+3 daysJun 1, 2009+10 days
EB-3 ChinaAug 1, 2015+24 daysJan 1, 2016
EB-3 IndiaJun 22, 2009+31 daysApr 1, 2010
EB-3 PhilippinesMar 1, 2018+3 monthsJul 1, 2018+4 months
EB-3 Other Workers ChinaAug 22, 2007+7 daysJun 1, 2008
EB-3 Other Workers IndiaJun 22, 2009+31 daysApr 1, 2010
EB-3 Other Workers PhilippinesMar 1, 2018+3 monthsJul 1, 2018+4 months
EB-4 El Salvador, Guatemala and HondurasMar 8, 2016+7 daysMay 15, 2016+14 days
EB-4 MexicoApr 1, 2018+3 monthsCurrent
Certain Religious Workers rest of world, China, India and PhilippinesCurrentUnavailable to CurrentCurrent
Certain Religious Workers El Salvador, Guatemala and HondurasMar 8, 2016Unavailable to Mar 8, 2016May 15, 2016+14 days
Certain Religious Workers MexicoApr 1, 2018Unavailable to Apr 1, 2018Current
Certain Religious Workers VietnamCurrentUnavailable to Current-
EB-5 non-regional center (C5 and T5) ChinaSep 15, 2014+7 daysOct 8, 2014+7 days
EB-5 non-regional center (C5 and T5) VietnamAug 22, 2016+38 days-
EB-5 regional center (I5 and R5) rest of world, El Salvador, Guatemala and Honduras, India, Mexico and PhilippinesCurrentUnavailable to CurrentCurrent
EB-5 regional center (I5 and R5) ChinaSep 15, 2014Unavailable to Sep 15, 2014Oct 8, 2014+7 days
EB-5 regional center (I5 and R5) VietnamAug 22, 2016Unavailable to Aug 22, 2016-

Family-sponsored, Final Action Dates

A green card can be approved for a priority date earlier than the cutoff. Abroad, that is when the visa interview can be scheduled. "Current" means every priority date qualifies; "Unavailable" means no green cards in that line this month.

In the US, USCIS is using Dates for Filing, not this chart, for I-485s filed in Apr 2019.

Family-sponsoredAll other countriesChina (mainland born)IndiaMexicoPhilippines
F1Dec 1, 2011+40 daysDec 1, 2011+40 daysDec 1, 2011+40 daysAug 8, 1997+7 daysApr 8, 2007+7 days
F2AMar 1, 2017+2 monthsMar 1, 2017+2 monthsMar 1, 2017+2 monthsFeb 15, 2017+2 monthsMar 1, 2017+2 months
F2BOct 22, 2012+3 monthsOct 22, 2012+3 monthsOct 22, 2012+3 monthsDec 1, 1997+2 monthsAug 1, 2007+10 days
F3Sep 22, 2006+14 daysSep 22, 2006+14 daysSep 22, 2006+14 daysFeb 8, 1996+24 daysJun 1, 1996+5 months
F4Jan 1, 2006+3 monthsJan 1, 2006+3 monthsJul 15, 2004+7 daysFeb 8, 1998Jun 1, 1996+5 months

Family-sponsored, Dates for Filing

An application can be filed, or documents sent to the National Visa Center, for a priority date earlier than the cutoff, when USCIS says this chart may be used.

In the US, USCIS is using this chart for I-485s filed in Apr 2019.

Family-sponsoredAll other countriesChina (mainland born)IndiaMexicoPhilippines
F1Jul 1, 2012+2 monthsJul 1, 2012+2 monthsJul 1, 2012+2 monthsOct 1, 1999+9 daysApr 8, 2008+7 days
F2ADec 15, 2017+7 daysDec 15, 2017+7 daysDec 15, 2017+7 daysDec 15, 2017+7 daysDec 15, 2017+7 days
F2BJul 1, 2014+9 daysJul 1, 2014+9 daysJul 1, 2014+9 daysJul 1, 1998+5 monthsMar 1, 2008+39 days
F3Apr 22, 2007+2 monthsApr 22, 2007+2 monthsApr 22, 2007+2 monthsJun 15, 2000+7 daysSep 1, 1997
F4Aug 1, 2006+40 daysAug 1, 2006+40 daysFeb 15, 2005+7 daysNov 15, 1998+7 daysJan 15, 1998+7 days

Employment-based, Final Action Dates

In the US, USCIS is using this chart for I-485s filed in Apr 2019.

Employment-basedAll other countriesChina (mainland born)El Salvador, Guatemala, HondurasIndiaMexicoPhilippinesVietnam
EB-1Feb 1, 2018+31 daysFeb 22, 2017Feb 1, 2018+31 daysFeb 22, 2017Feb 1, 2018+31 daysFeb 1, 2018+31 daysFeb 1, 2018+31 days
EB-2CurrentApr 1, 2016+3 monthsCurrentApr 12, 2009+3 daysCurrentCurrentCurrent
EB-3CurrentAug 1, 2015+24 daysCurrentJun 22, 2009+31 daysCurrentMar 1, 2018+3 monthsCurrent
EB-3 Other WorkersCurrentAug 22, 2007+7 daysCurrentJun 22, 2009+31 daysCurrentMar 1, 2018+3 monthsCurrent
EB-4CurrentCurrentMar 8, 2016+7 daysCurrentApr 1, 2018+3 monthsCurrentCurrent
Certain Religious WorkersCurrentUnavailable to CurrentCurrentUnavailable to CurrentMar 8, 2016Unavailable to Mar 8, 2016CurrentUnavailable to CurrentApr 1, 2018Unavailable to Apr 1, 2018CurrentUnavailable to CurrentCurrentUnavailable to Current
EB-5 non-regional center (C5 and T5)CurrentSep 15, 2014+7 daysCurrentCurrentCurrentCurrentAug 22, 2016+38 days
EB-5 regional center (I5 and R5)CurrentUnavailable to CurrentSep 15, 2014Unavailable to Sep 15, 2014CurrentUnavailable to CurrentCurrentUnavailable to CurrentCurrentUnavailable to CurrentCurrentUnavailable to CurrentAug 22, 2016Unavailable to Aug 22, 2016

Employment-based, Dates for Filing

In the US, USCIS is using Final Action Dates, not this chart, for I-485s filed in Apr 2019.

Employment-basedAll other countriesChina (mainland born)El Salvador, Guatemala, HondurasIndiaMexicoPhilippines
EB-1Jun 1, 2018Oct 1, 2017Jun 1, 2018Oct 1, 2017Jun 1, 2018Jun 1, 2018
EB-2CurrentJul 1, 2016+2 monthsCurrentJun 1, 2009+10 daysCurrentCurrent
EB-3CurrentJan 1, 2016CurrentApr 1, 2010CurrentJul 1, 2018+4 months
EB-3 Other WorkersCurrentJun 1, 2008CurrentApr 1, 2010CurrentJul 1, 2018+4 months
EB-4CurrentCurrentMay 15, 2016+14 daysCurrentCurrentCurrent
Certain Religious WorkersCurrentCurrentMay 15, 2016+14 daysCurrentCurrentCurrent
EB-5 non-regional center (C5 and T5)CurrentOct 8, 2014+7 daysCurrentCurrentCurrentCurrent
EB-5 regional center (I5 and R5)CurrentOct 8, 2014+7 daysCurrentCurrentCurrentCurrent

What State had said to expect for this month

The February 2019 and May 2018 bulletins said what to expect for the months ahead in 23 statements whose window, under the rule, reaches the April 2019 bulletin: 16 of 23 with a direction matched over the whole window. The result is for the statement’s whole window, of which this bulletin is one month; the dates under it are what each bulletin in the window printed.

BulletinWhat State saidResult, and what the next bulletins printed
Feb 2019F1 rest of world“Up to five weeks”did not matchMar 2019: Oct 22, 2011 (forward from Sep 22, 2011); Apr 2019: Dec 1, 2011 (forward from Oct 22, 2011); May 2019: Jan 8, 2012 (forward from Dec 1, 2011)F1 rest of world so far: 3 of 6 matched
Feb 2019F2A rest of world“Up to one month”did not matchMar 2019: Jan 8, 2017 (forward from Dec 1, 2016); Apr 2019: Mar 1, 2017 (forward from Jan 8, 2017); May 2019: May 15, 2017 (forward from Mar 1, 2017)F2A rest of world so far: 2 of 6 matched
Feb 2019F2B rest of world“Up to two months”did not matchMar 2019: Aug 1, 2012 (forward from May 1, 2012); Apr 2019: Oct 22, 2012 (forward from Aug 1, 2012); May 2019: Feb 1, 2013 (forward from Oct 22, 2012)F2B rest of world so far: 5 of 6 matched
Feb 2019F3 rest of world“Up to two weeks”did not matchMar 2019: Sep 8, 2006 (forward from Aug 22, 2006); Apr 2019: Sep 22, 2006 (forward from Sep 8, 2006); May 2019: Nov 8, 2006 (forward from Sep 22, 2006)F3 rest of world so far: 5 of 6 matched
Feb 2019F4 rest of world“Up to six weeks”did not matchMar 2019: Sep 22, 2005 (forward from Jun 22, 2005); Apr 2019: Jan 1, 2006 (forward from Sep 22, 2005); May 2019: Feb 15, 2006 (forward from Jan 1, 2006)F4 rest of world so far: 3 of 7 matched
Feb 2019EB-1 rest of world“Up to two months.”matchedMar 2019: Jan 1, 2018 (forward from Dec 1, 2017); Apr 2019: Feb 1, 2018 (forward from Jan 1, 2018); May 2019: Mar 1, 2018 (forward from Feb 1, 2018)EB-1 rest of world so far: 5 of 6 matched
Feb 2019EB-1 China“Up to one month.”matchedMar 2019: Feb 22, 2017 (forward from Feb 8, 2017); Apr 2019: Feb 22, 2017; May 2019: Feb 22, 2017EB-1 China so far: 2 of 2 matched
Feb 2019EB-1 IndiamatchedMar 2019: Feb 22, 2017 (forward from Feb 8, 2017); Apr 2019: Feb 22, 2017; May 2019: Feb 22, 2017EB-1 India so far: 2 of 2 matched
Feb 2019EB-2 rest of world“Current for the foreseeable future.”matchedMar 2019: Current; Apr 2019: Current; May 2019: CurrentEB-2 rest of world so far: 6 of 7 matched
Feb 2019EB-2 China“Up to three months.”matchedMar 2019: Jan 1, 2016 (forward from Oct 1, 2015); Apr 2019: Apr 1, 2016 (forward from Jan 1, 2016); May 2019: May 15, 2016 (forward from Apr 1, 2016)EB-2 China so far: 3 of 5 matched
Feb 2019EB-2 India“Up to one week”matchedMar 2019: Apr 9, 2009 (forward from Apr 6, 2009); Apr 2019: Apr 12, 2009 (forward from Apr 9, 2009); May 2019: Apr 16, 2009 (forward from Apr 12, 2009)EB-2 India so far: 4 of 6 matched
Feb 2019EB-3 rest of world“Current”matchedMar 2019: Current; Apr 2019: Current; May 2019: CurrentEB-3 rest of world so far: 6 of 6 matched
Feb 2019EB-3 China“Up to three weeks.”matchedMar 2019: Jul 8, 2015 (forward from Jul 1, 2015); Apr 2019: Aug 1, 2015 (forward from Jul 8, 2015); May 2019: Aug 22, 2015 (forward from Aug 1, 2015)EB-3 China so far: 5 of 7 matched
Feb 2019EB-3 India“Up to three months.”matchedMar 2019: May 22, 2009 (forward from Apr 22, 2009); Apr 2019: Jun 22, 2009 (forward from May 22, 2009); May 2019: Jul 1, 2009 (forward from Jun 22, 2009)EB-3 India so far: 3 of 4 matched
Feb 2019EB-3 Mexico“Current”matchedMar 2019: Current; Apr 2019: Current; May 2019: CurrentEB-3 Mexico so far: 4 of 4 matched
Feb 2019EB-3 Philippines“Rapid movement to generate demand.”matchedMar 2019: Dec 1, 2017 (forward from Aug 1, 2017); Apr 2019: Mar 1, 2018 (forward from Dec 1, 2017); May 2019: Jun 1, 2018 (forward from Mar 1, 2018)EB-3 Philippines so far: 3 of 5 matched
Feb 2019EB-4 rest of world“Current for most countries.”matchedMar 2019: Current; Apr 2019: Current; May 2019: CurrentEB-4 rest of world so far: 6 of 7 matched
Feb 2019EB-4 El Salvador, Guatemala and Honduras“Up to one week.”matchedMar 2019: Mar 1, 2016; Apr 2019: Mar 8, 2016 (forward from Mar 1, 2016); May 2019: Mar 8, 2016EB-4 El Salvador, Guatemala and Honduras so far: 4 of 4 matched
Feb 2019EB-4 Mexico“Rapid forward movement until limit is reached.”matchedMar 2019: Jan 1, 2018 (forward from Sep 1, 2017); Apr 2019: Apr 1, 2018 (forward from Jan 1, 2018); May 2019: Aug 1, 2018 (forward from Apr 1, 2018)EB-4 Mexico so far: 4 of 5 matched
Feb 2019EB-5 unreserved rest of world“The category will remain “Current” for most countries.”matchedMar 2019: Current; Apr 2019: Current; May 2019: CurrentEB-5 unreserved rest of world so far: 6 of 6 matched
Feb 2019EB-5 unreserved China“Up to one week.”matchedMar 2019: Sep 8, 2014 (forward from Sep 1, 2014); Apr 2019: Sep 15, 2014 (forward from Sep 8, 2014); May 2019: Sep 22, 2014 (forward from Sep 15, 2014)EB-5 unreserved China so far: 3 of 5 matched
Feb 2019EB-5 unreserved Vietnam“Up to three weeks.”did not matchMar 2019: Jul 15, 2016 (forward from Jun 15, 2016); Apr 2019: Aug 22, 2016 (forward from Jul 15, 2016); May 2019: Sep 22, 2016 (forward from Aug 22, 2016)EB-5 unreserved Vietnam so far: 1 of 3 matched
May 2018EB-5 unreserved Vietnam“Continued heavy applicant demand will result in the Vietnam Employment Fifth preference (EB-5) category reaching the per-country annual limit during April. As a result it has been necessary to impose a final action date on this preference for the month of May to control number use for the remainder of the fiscal year. It can be expected that the Vietnam Employment Fifth preference category will remain subject to a final action date for the foreseeable future.”did not matchJun 2018: Aug 1, 2014 (forward from Jul 22, 2014); Jul 2018: Aug 1, 2014; Aug 2018: Aug 1, 2014; Sep 2018: Aug 8, 2014 (forward from Aug 1, 2014); Oct 2018: Jan 1, 2016 (forward from Aug 8, 2014); Nov 2018: Feb 1, 2016 (forward from Jan 1, 2016); Dec 2018: May 1, 2016 (forward from Feb 1, 2016); Jan 2019: Jun 1, 2016 (forward from May 1, 2016); Feb 2019: Jun 15, 2016 (forward from Jun 1, 2016); Mar 2019: Jul 15, 2016 (forward from Jun 15, 2016); Apr 2019: Aug 22, 2016 (forward from Jul 15, 2016)EB-5 unreserved Vietnam so far: 0 of 1 matched

What State said to expect, and what happened

Under “FINAL ACTION DATE MOVEMENTS” (page 8), the April 2019 bulletin said what it expected for the months ahead. Each statement is State’s wording; the result applies one written rule to the Final Action cutoffs the next bulletins printed: no statement named a line and a direction the rule can check. All bulletins and the tally per line.

What the bulletin said about no single line (1 remark, not scored)

Every line: “Final Action Date movement in many Family-sponsored and Employment-based preference categories continues to be greater than might ordinarily be expected, and this is anticipated to continue for at least the next few months. This is a direct result of fewer applicants proceeding to final action on their cases at consular posts abroad and USCIS Offices. Once large numbers of applicants begin to have their cases brought to final action, final action date movements will necessarily slow or stop. Moreover, in some categories, final action date retrogression is a possibility if demand levels are excessive. Therefore, readers should be aware that the recent rates of final action date advances will not continue indefinitely, but it is not possible to say at present when they will end.”

About this page

Every value is the one printed in the April 2019 bulletin, read from the PDF by two programs that agree on every cell and spot-checked by eye; the change in each cell compares it with the Mar 2019 bulletin. Rows the bulletin prints that are not here (the EB-5 infrastructure set-aside in some months) are rows our readers do not yet read. This is not legal advice. Sources and method. Download every month: eb-cutoffs.csv.

Cite this page

Green Card Wait. “April 2019 Visa Bulletin: every cutoff and what moved.” Data as of the April 2019 Visa Bulletin (State PDF sha256 a5ce804ae103). https://www.greencardwait.com/visa-bulletin/april-2019/. Add the date you read it.

@misc{greencardwait-april-2019-visa-bulletin-every-c-2019-04,
  author = {Green Card Wait},
  title = {April 2019 Visa Bulletin: every cutoff and what moved},
  howpublished = {\url{https://www.greencardwait.com/visa-bulletin/april-2019/}},
  year = {2019},
  note = {Data as of the April 2019 Visa Bulletin (State PDF sha256 a5ce804ae103); add the access date as urldate}
}

The cutoffs are the Department of State’s: cite the bulletin itself for a cutoff and this page for the compilation, the movement arithmetic and the checks. Corrections lists anything that was live and wrong.