Priority dates

EB-2 China priority date

Where the line is in the newest Visa Bulletin, and where your date stands against it.

EB-2, for people born in mainland China

Priority dates before

You can send in your application if your date is before Jan 1, 2023. USCIS is using this chart for I-485s in November 2026.

Read from the November 2026 Visa Bulletin.

EB-2 China, November 2026 Visa Bulletin. Where you stand:

Moved in the past year
+6 months
of priority dates in 12 bulletins
Moved in the past 3 years
+2.0 years
of priority dates in 36 bulletins
What do these dates mean?

What changed in the Nov 2026 bulletin (vs. Oct 2026): Final Action unchanged at Oct 1, 2021. Date for Filing unchanged at Jan 1, 2023. Final Action last changed in the Oct 2026 bulletin (Sep 1, 2021 to Oct 1, 2021).

Filing an I-485 in Nov 2026: USCIS designated the Dates for Filing chart for employment-based categories, so the Date for Filing cutoff above is the one that applies this month. USCIS, read Oct 23, 2026. Every month since October 2016.

Built from the November 2026 Visa Bulletin, the newest one we have checked, checked against State's PDF.

Every cell was read by two programs that agree and spot-checked by eye against the printed table (sources and method). Current bulletin: travel.state.gov.

中文数字摘要 (figures in Chinese)

EB-2 China: 签证公告,2026年11月

如果您的优先日期 (priority date) 早于2021年10月1日,本月有签证名额;晚于则尚未。 优先日期是 PERM 或 I-130 的递交日期,写在 I-797 通知上。

仅翻译了数字;整页为英文。不构成法律建议。

Email me when EB-2 China moves: one email per bulletin that moves this line or switches its chart, nothing else.

Your date vs. the line

Which country is mine? Where is my priority date?

Country means the country of birth (the bulletin calls it chargeability; a spouse’s country can be used instead). Nigeria, the United Kingdom, Brazil and most countries are “All other countries”. Your priority date is printed as “Priority Date” on your I-140 or I-130 receipt or approval notice (Form I-797); for a job-based case it is the day the PERM labor certification was filed.

Add your priority date above to see how far the line is from it, and whether you can apply now.

How the line has moved

EB-2 China cutoff date by bulletin month

Over the last 36 bulletins, Final Action moved forward 14 times, stayed the same 22 times and moved back 0 times; the median change is no change.

Each point is the cutoff printed in that month's bulletin. "Current" months are drawn at the bulletin month itself; "unavailable" months are gaps.

Embed this chart on your site

Paste this where the chart should appear. It loads a page with only this chart, which updates with every bulletin we publish, and links back here.

<iframe src="https://www.greencardwait.com/embed/eb2-china-priority-date/" width="100%" height="540" loading="lazy" title="EB-2 China Visa Bulletin cutoff chart, Green Card Wait"></iframe>

EB-2 China wait time

About 9 years at today's pace.

The line is at Oct 1, 2021, 5.1 years behind the calendar. It moved 6 months in the past year and 2.0 years in the past three. At that pace, someone joining today reaches the front in about 9 years. The pace changes from month to month, so this is a reading, not a promise.

Every line by country of birth, read the same way: green card wait time by country. Your own priority date against this line: your date vs. the line, above.

Email me when this line moves

Every EB-2 China cutoff in the archive

The Oct 2023 bulletin is the first of the government's fiscal year 2024. Final Action moved forward 3 months, from Jul 8, 2019 to Oct 1, 2019. The Jun 2023 to Sep 2023 bulletins show no pullback before it, so this was a forward move at the start of the year, not a reset.

Show all 122 bulletins, newest first
BulletinFinal ActionChange vs. previous bulletinDate for Filing
Nov 2026Oct 1, 2021no changeJan 1, 2023
Oct 2026Oct 1, 2021+30 daysJan 1, 2023
Sep 2026Sep 1, 2021no changeJan 1, 2022
Aug 2026Sep 1, 2021no changeJan 1, 2022
Jul 2026Sep 1, 2021no changeJan 1, 2022
Jun 2026Sep 1, 2021no changeJan 1, 2022
May 2026Sep 1, 2021no changeJan 1, 2022
Apr 2026Sep 1, 2021no changeJan 1, 2022
Mar 2026Sep 1, 2021no changeJan 1, 2022
Feb 2026Sep 1, 2021no changeJan 1, 2022
Jan 2026Sep 1, 2021+3 monthsJan 1, 2022
Dec 2025Jun 1, 2021+2 monthsDec 1, 2021
Nov 2025Apr 1, 2021no changeDec 1, 2021
Oct 2025Apr 1, 2021+4 monthsDec 1, 2021
Sep 2025Dec 15, 2020no changeJan 1, 2021
Aug 2025Dec 15, 2020no changeJan 1, 2021
Jul 2025Dec 15, 2020+14 daysJan 1, 2021
Jun 2025Dec 1, 2020+2 monthsJan 1, 2021
May 2025Oct 1, 2020no changeNov 1, 2020
Apr 2025Oct 1, 2020+5 monthsNov 1, 2020
Mar 2025May 8, 2020+16 daysOct 1, 2020
Feb 2025Apr 22, 2020no changeOct 1, 2020
Jan 2025Apr 22, 2020+31 daysOct 1, 2020
Dec 2024Mar 22, 2020no changeOct 1, 2020
Nov 2024Mar 22, 2020no changeOct 1, 2020
Oct 2024Mar 22, 2020+21 daysOct 1, 2020
Sep 2024Mar 1, 2020no changeJun 1, 2020
Aug 2024Mar 1, 2020no changeJun 1, 2020
Jul 2024Mar 1, 2020+29 daysJun 1, 2020
Jun 2024Feb 1, 2020no changeJun 1, 2020
May 2024Feb 1, 2020no changeJun 1, 2020
Apr 2024Feb 1, 2020+31 daysJun 1, 2020
Mar 2024Jan 1, 2020no changeJun 1, 2020
Feb 2024Jan 1, 2020no changeJun 1, 2020
Jan 2024Jan 1, 2020+2 monthsJun 1, 2020
Dec 2023Oct 22, 2019+21 daysJan 1, 2020
Nov 2023Oct 1, 2019no changeJan 1, 2020
Oct 2023Oct 1, 2019+3 monthsJan 1, 2020
Sep 2023Jul 8, 2019no changeOct 8, 2019
Aug 2023Jul 8, 2019+30 daysOct 8, 2019
Jul 2023Jun 8, 2019no changeJul 8, 2019
Jun 2023Jun 8, 2019no changeJul 8, 2019
May 2023Jun 8, 2019no changeJul 8, 2019
Apr 2023Jun 8, 2019no changeJul 8, 2019
Mar 2023Jun 8, 2019no changeJul 8, 2019
Feb 2023Jun 8, 2019no changeJul 8, 2019
Jan 2023Jun 8, 2019no changeJul 8, 2019
Dec 2022Jun 8, 2019no changeJul 8, 2019
Nov 2022Jun 8, 2019no changeJul 8, 2019
Oct 2022Jun 8, 2019+2 monthsJul 8, 2019
Sep 2022Apr 1, 2019no changeMay 1, 2019
Aug 2022Apr 1, 2019no changeMay 1, 2019
Jul 2022Apr 1, 2019+31 daysMay 1, 2019
Jun 2022Mar 1, 2019no changeApr 1, 2019
May 2022Mar 1, 2019no changeApr 1, 2019
Apr 2022Mar 1, 2019no changeApr 1, 2019
Mar 2022Mar 1, 2019no changeApr 1, 2019
Feb 2022Mar 1, 2019+38 daysApr 1, 2019
Jan 2022Jan 22, 2019+21 daysApr 1, 2019
Dec 2021Jan 1, 2019+2 monthsApr 1, 2019
Nov 2021Nov 15, 2018+5 monthsFeb 1, 2019
Oct 2021Jul 1, 2018no changeSep 1, 2018
Sep 2021Jul 1, 2018+3 monthsSep 1, 2018
Aug 2021Apr 1, 2018+4 monthsJul 1, 2018
Jul 2021Dec 1, 2017+7 monthsJul 1, 2018
Jun 2021May 1, 2017+5 monthsJan 1, 2018
May 2021Dec 1, 2016+3 monthsJul 1, 2017
Apr 2021Sep 1, 2016+2 monthsJan 1, 2017
Mar 2021Jul 15, 2016+30 daysOct 1, 2016
Feb 2021Jun 15, 2016+14 daysOct 1, 2016
Jan 2021Jun 1, 2016+31 daysOct 1, 2016
Dec 2020May 1, 2016+9 daysOct 1, 2016
Nov 2020Apr 22, 2016+2 monthsOct 1, 2016
Oct 2020Mar 1, 2016+2 monthsOct 1, 2016
Sep 2020Jan 15, 2016no changeAug 1, 2016
Aug 2020Jan 15, 2016+2 monthsAug 1, 2016
Jul 2020Nov 8, 2015+7 daysAug 1, 2016
Jun 2020Nov 1, 2015+31 daysAug 1, 2016
May 2020Oct 1, 2015+30 daysAug 1, 2016
Apr 2020Sep 1, 2015+17 daysAug 1, 2016
Mar 2020Aug 15, 2015+31 daysAug 1, 2016
Feb 2020Jul 15, 2015+14 daysAug 1, 2016
Jan 2020Jul 1, 2015+9 daysAug 1, 2016
Dec 2019Jun 22, 2015+3 monthsAug 1, 2016
Nov 2019Mar 15, 2015+2 monthsAug 1, 2016
Oct 2019Jan 1, 2015back 2.0 yearsAug 1, 2016
Sep 2019Jan 1, 2017no changeJun 1, 2017
Aug 2019Jan 1, 2017+2 monthsFeb 1, 2017
Jul 2019Nov 1, 2016+3 monthsFeb 1, 2017
Jun 2019Aug 1, 2016+3 monthsNov 1, 2016
May 2019May 15, 2016+44 daysSep 1, 2016
Apr 2019Apr 1, 2016+3 monthsJul 1, 2016
Mar 2019Jan 1, 2016+3 monthsMay 1, 2016
Feb 2019Oct 1, 2015+2 monthsNov 1, 2015
Jan 2019Aug 1, 2015+31 daysSep 8, 2015
Dec 2018Jul 1, 2015+2 monthsSep 8, 2015
Nov 2018May 15, 2015+44 daysJun 15, 2015
Oct 2018Apr 1, 2015+2.2 yearsJun 15, 2015
Sep 2018Jan 1, 2013back 2.2 yearsApr 1, 2015
Aug 2018Mar 1, 2015+2 monthsApr 1, 2015
Jul 2018Jan 1, 2015+4 monthsApr 1, 2015
Jun 2018Sep 1, 2014no changeFeb 1, 2015
May 2018Sep 1, 2014+31 daysFeb 1, 2015
Apr 2018Aug 1, 2014+8 monthsFeb 1, 2015
Mar 2018Dec 8, 2013+2 monthsFeb 1, 2015
Feb 2018Oct 1, 2013+2 monthsNov 15, 2014
Jan 2018Aug 8, 2013+38 daysNov 15, 2013
Dec 2017Jul 1, 2013+16 daysNov 15, 2013
Nov 2017Jun 15, 2013+24 daysNov 15, 2013
Oct 2017May 22, 2013+7 daysNov 15, 2013
Sep 2017May 15, 2013+23 daysOct 1, 2013
Aug 2017Apr 22, 2013+31 daysOct 1, 2013
Jul 2017Mar 22, 2013+21 daysOct 1, 2013
Jun 2017Mar 1, 2013+21 daysOct 1, 2013
May 2017Feb 8, 2013+24 daysOct 1, 2013
Apr 2017Jan 15, 2013+31 daysMar 1, 2013
Mar 2017Dec 15, 2012+30 daysMar 1, 2013
Feb 2017Nov 15, 2012+31 daysMar 1, 2013
Jan 2017Oct 15, 2012+23 daysMar 1, 2013
Dec 2016Sep 22, 2012+2 monthsMar 1, 2013
Nov 2016Jul 15, 2012+5 monthsMar 1, 2013
Oct 2016Feb 15, 2012-Mar 1, 2013

What State said about this line, and what happened

EB-2 China: State named this line in 14 statements about the months ahead, in 14 of the 122 bulletins since October 2016; 6 of 13 matched what the next bulletins printed (7 did not, 1 not scorable).

State’s wording, newest first. The result applies one written rule to the Final Action cutoffs the next bulletins printed; it is a record of State’s expectations, not a forecast of ours. The newest 12 are below; the other 2 are on the outlook page.

BulletinWhat State saidResult, and what the next bulletins printed
Jul 2026“Sufficient demand and increased number use by aliens chargeable to China in the EB-2 visa category may make it necessary to retrogress the final action date or make the category unavailable in the coming months to hold number use within the maximum allowed under the FY 2026 annual limit. This situation will be continually monitored, and any necessary adjustments will be made accordingly.”did not matchAug 2026: Sep 1, 2021; Sep 2026: Sep 1, 2021; Oct 2026: Oct 1, 2021 (forward from Sep 1, 2021)EB-2 China so far: 6 of 13 matched
Jun 2026“Sufficient demand and increased number use by aliens chargeable to China in the EB-2 visa category may make it necessary to retrogress the final action date or make the category unavailable in the coming months to hold number use within the maximum allowed under the FY 2026 annual limit. This situation will be continually monitored, and any necessary adjustments will be made accordingly.”did not matchJul 2026: Sep 1, 2021; Aug 2026: Sep 1, 2021; Sep 2026: Sep 1, 2021EB-2 China so far: 6 of 12 matched
Mar 2023“Since December 2022, there has been higher than expected number use and demand, mostly due to continued new filings by applicants from all countries with priority dates earlier than the established final action dates. This will necessitate corrective action in the coming months to hold number use within the maximum allowed under the Fiscal Year 2023 annual limit. This situation will be continually monitored, and any necessary adjustments will be made accordingly.”did not matchApr 2023: Jun 8, 2019; May 2023: Jun 8, 2019; Jun 2023: Jun 8, 2019EB-2 China so far: 6 of 11 matched
Oct 2021“Up to several months”matchedNov 2021: Nov 15, 2018 (forward from Jul 1, 2018); Dec 2021: Jan 1, 2019 (forward from Nov 15, 2018); Jan 2022: Jan 22, 2019 (forward from Jan 1, 2019)EB-2 China so far: 6 of 10 matched
Feb 2021“Up to three weeks”did not matchMar 2021: Jul 15, 2016 (forward from Jun 15, 2016); Apr 2021: Sep 1, 2016 (forward from Jul 15, 2016); May 2021: Dec 1, 2016 (forward from Sep 1, 2016)EB-2 China so far: 5 of 9 matched
Oct 2020“Rapid forward movement”matchedNov 2020: Apr 22, 2016 (forward from Mar 1, 2016); Dec 2020: May 1, 2016 (forward from Apr 22, 2016); Jan 2021: Jun 1, 2016 (forward from May 1, 2016)EB-2 China so far: 5 of 8 matched
Jan 2020“Up to one month”matchedFeb 2020: Jul 15, 2015 (forward from Jul 1, 2015); Mar 2020: Aug 15, 2015 (forward from Jul 15, 2015); Apr 2020: Sep 1, 2015 (forward from Aug 15, 2015)EB-2 China so far: 4 of 7 matched
Oct 2019“Up to two months”did not matchNov 2019: Mar 15, 2015 (forward from Jan 1, 2015); Dec 2019: Jun 22, 2015 (forward from Mar 15, 2015); Jan 2020: Jul 1, 2015 (forward from Jun 22, 2015)EB-2 China so far: 3 of 6 matched
Feb 2019“Up to three months.”matchedMar 2019: Jan 1, 2016 (forward from Oct 1, 2015); Apr 2019: Apr 1, 2016 (forward from Jan 1, 2016); May 2019: May 15, 2016 (forward from Apr 1, 2016)EB-2 China so far: 3 of 5 matched
Sep 2018“Slow movement pending receipt of demand from recent advances”not scorabletoo vague to check (little or no movement, or too early to say)
Feb 2018“Several months”matchedMar 2018: Dec 8, 2013 (forward from Oct 1, 2013); Apr 2018: Aug 1, 2014 (forward from Dec 8, 2013); May 2018: Sep 1, 2014 (forward from Aug 1, 2014)EB-2 China so far: 2 of 4 matched
Oct 2017“Up to four weeks”did not matchNov 2017: Jun 15, 2013 (forward from May 22, 2013); Dec 2017: Jul 1, 2013 (forward from Jun 15, 2013); Jan 2018: Aug 8, 2013 (forward from Jul 1, 2013)EB-2 China so far: 1 of 3 matched

Approved petitions waiting for a visa in this line

34,936 approved I-140, I-360 and I-526 petitions for 2nd preference, China, were waiting for a visa number as of June 2026, by USCIS's count (report posted Sep 8, 2026).

It is not the number of people ahead of your priority date: USCIS counts petitions, not people, and the count includes petitions filed after yours.

What this count is, and is not

This is the one figure here that comes from USCIS rather than the Visa Bulletin: its Form I-140, I-360, I-526 Approved EB Petitions Awaiting Visa Final Priority Dates (FY2026 Q3) report (USCIS data page), tabulated by preference and country of birth. We read the workbook with two programs that agree on every cell, checked that its rows and columns add up to its own totals, and read this cell by eye from the sheet; the file's fingerprint is recorded with the check.

What it is not. It is not the number of people ahead of your priority date. USCIS counts petitions, not people: one person can have more than one approved petition, and spouses and children (derivatives) are not counted at all. It counts every approved petition in the line whose priority date was not yet current under the June 2026 Final Action chart, whatever that priority date is, so petitions filed after yours are in it too. Petitions still pending at USCIS are not in it, and petitions whose beneficiary has since become a permanent resident or citizen are taken out. USCIS says counts can change between reports as its systems update. We print the number as reported. The one thing derived from it is the ratio in the next section, petitions waiting against the numbers this line gets a year, stated as a ratio with what it leaves out; no queue position, no forecast. Every line in one table: the green card backlog by category and country.

Visa numbers this line actually got, by year

6,556 numbers in fiscal year 2024 for EB-2 China: immigrant visas issued abroad plus adjustments of status approved in the United States, employment-based EB-2, China, by the State Department's count.

Fiscal year (Oct to Sep)Numbers used
FY20154,202
FY20162,837
FY20172,559
FY20182,681
FY20193,369
FY20203,118
FY20216,091
FY20228,523
FY20236,371
FY20246,556

Average over FY2020-FY2024: 6,132 a year. This is the supply side of the line: the Visa Bulletin cutoff moves as far as these numbers reach into the queue.

Petitions waiting against numbers used: USCIS counted 34,936 approved petitions waiting in this line as of June 2026. At 6,132 numbers a year, the FY2020-FY2024 average, that many petitions would take about 5.7 years of this line's numbers. On the median of those five years (6,371 numbers) it would be about 5.5 years; one spillover year (FY2022, 8,523) moves the average that much. That is a ratio, not a forecast of your wait: each petition's spouse and children need numbers too and are not in the count, petitions filed after yours are in it, new petitions keep arriving, and the numbers a line gets swing from year to year.

Where these figures come from

State's Report of the Visa Office, Table V, "Immigrant Visas Issued and Adjustments of Status Subject to Numerical Limitations", by foreign state of chargeability: one table per fiscal year (FY2015, FY2016, FY2017, FY2018, FY2019, FY2020, FY2021, FY2022, FY2023, FY2024). Each PDF is kept in the repository with its address and fingerprint, read by two programs that share no code (one by the position of every number on the page, one from the page's text stream), and the India rows of the employment table were read by eye for every year. Numbers used means visas issued at consulates plus adjustments approved by USCIS, principal applicants and their family members together, in the fiscal year. FY2025 is published by State about a year after it ends.

Findings about this line

Counted through the November 2026 bulletin, from ten years of bulletins. All findings.

Other categories

Still waiting on PERM? The PERM processing time tracker compares your filing month with DOL's current queue month and lists every 2026 update we have read. Family-sponsored categories (F1, F2A, F2B, F3, F4) have their own pages: all categories.

Side by side with the line next to it: EB-2 China vs EB-3 China, EB-1 China vs EB-2 China. Every country against the rest of the world: compare lines.

About this data

Parsed from the U.S. Department of State Visa Bulletin. The wait figures are arithmetic on past movement, not a forecast: cutoffs can stall or move backward. This is not legal advice. Sources and method. Download the full table: eb-cutoffs.csv or eb-cutoffs.json; the newest bulletin alone: latest.json.

How the movement figures are counted

How we count: a Current month means there is no line, so it is placed at the bulletin month itself, as in the chart. An Unavailable month has no cutoff and is skipped. A movement figure needs a cutoff at both ends of its window, so it shows n/a when this month is Current or Unavailable. In the forward/same/back counts, Current to Current and Unavailable to Unavailable count as the same; changes into or out of Current or Unavailable are left out because they have no length, and the median uses only changes between two dated cutoffs. When the bulletin right after a window starts moved the line forward 6 months or more (often the October reset after a September holdback at the end of the government's fiscal year), the figure is labelled and shown again from that next bulletin.

Cite this page

Green Card Wait. “EB-2 China priority date: Visa Bulletin cutoff history.” Data as of the November 2026 Visa Bulletin (State PDF sha256 b604a4ade1a0). https://www.greencardwait.com/eb2-china-priority-date/. Add the date you read it.

@misc{greencardwait-eb-2-china-priority-date-visa-bu-2026-11,
  author = {Green Card Wait},
  title = {EB-2 China priority date: Visa Bulletin cutoff history},
  howpublished = {\url{https://www.greencardwait.com/eb2-china-priority-date/}},
  year = {2026},
  note = {Data as of the November 2026 Visa Bulletin (State PDF sha256 b604a4ade1a0); add the access date as urldate}
}

The cutoffs are the Department of State’s: cite the bulletin itself for a cutoff and this page for the compilation, the movement arithmetic and the checks. Corrections lists anything that was live and wrong.