Visa Bulletin

March 2017 Visa Bulletin

Both family-sponsored and both employment-based tables, every cell with its change from the Feb 2017 bulletin. A cutoff links to that line's own tracker.

Read from the Department of State's March 2017 Visa Bulletin (PDF fingerprint 630c423e4ec4), parsed twice by different programs and hand-checked. This is the bulletin for fiscal year 2017. Sources and method.

Your line in the March 2017 bulletin

Pick your category to see its two cutoffs in the March 2017 bulletin, what changed, and which one an I-485 filed this month goes by. Country means country of birth; most countries are All other countries.

For Mar 2017 adjustment of status filings, USCIS designated the Dates for Filing chart for family-sponsored categories and the Final Action Dates chart for employment-based categories (USCIS, read Oct 23, 2026; every month since October 2016).

What moved in the March 2017 bulletin

Compared with the Feb 2017 bulletin. Final Action Dates: of 73 cells, 38 moved forward, 0 moved back, 35 did not change and 0 switched between a date and Current or Unavailable. Dates for Filing: of 65 cells, 0 moved forward, 0 moved back, 65 did not change and 0 switched between a date and Current or Unavailable.

Every line that moved

One row per line; countries that printed the same two cutoffs share a row. The full tables below have every line.

LineFinal ActionDates for Filing
F1 rest of world, China and IndiaJun 1, 2010+3 monthsJan 1, 2011
F1 MexicoMay 15, 1995+7 daysJun 1, 1995
F1 PhilippinesDec 15, 2005+14 daysMay 1, 2006
F2A rest of world, China, India and PhilippinesMay 8, 2015+23 daysNov 22, 2015
F2A MexicoApr 22, 2015+21 daysNov 22, 2015
F2B rest of world, China and IndiaAug 15, 2010+38 daysFeb 8, 2011
F2B MexicoNov 22, 1995+14 daysJun 1, 1996
F2B PhilippinesMay 1, 2006+23 daysFeb 1, 2007
F3 rest of world, China and IndiaApr 22, 2005+31 daysAug 22, 2005
F3 MexicoDec 22, 1994+7 daysMay 1, 1995
F4 rest of worldFeb 22, 2004+14 daysJul 1, 2004
F4 ChinaFeb 22, 2004+31 daysJul 1, 2004
F4 IndiaJul 22, 2003+37 daysMay 1, 2004
F4 MexicoJun 1, 1997+10 daysDec 1, 1997
F4 PhilippinesAug 1, 1993+40 daysApr 1, 1994
EB-2 ChinaDec 15, 2012+30 daysMar 1, 2013
EB-2 IndiaJun 1, 2008+2 monthsApr 22, 2009
EB-3 rest of world and MexicoDec 1, 2016+2 monthsCurrent
EB-3 ChinaMar 15, 2014+5 monthsMay 1, 2014
EB-3 El Salvador, Guatemala and HondurasDec 1, 2016+2 months-
EB-3 PhilippinesMar 15, 2012+5 monthsSep 1, 2013
EB-3 Other Workers rest of world and MexicoDec 1, 2016+2 monthsCurrent
EB-3 Other Workers ChinaFeb 1, 2006+2 monthsAug 1, 2009
EB-3 Other Workers El Salvador, Guatemala and HondurasDec 1, 2016+2 months-
EB-3 Other Workers PhilippinesMar 15, 2012+5 monthsSep 1, 2013
EB-5 non-regional center (C5 and T5) ChinaMay 1, 2014+16 daysJun 15, 2014
EB-5 regional center (I5 and R5) ChinaMay 1, 2014+16 daysJun 15, 2014

Family-sponsored, Final Action Dates

A green card can be approved for a priority date earlier than the cutoff. Abroad, that is when the visa interview can be scheduled. "Current" means every priority date qualifies; "Unavailable" means no green cards in that line this month.

In the US, USCIS is using Dates for Filing, not this chart, for I-485s filed in Mar 2017.

Family-sponsoredAll other countriesChina (mainland born)IndiaMexicoPhilippines
F1Jun 1, 2010+3 monthsJun 1, 2010+3 monthsJun 1, 2010+3 monthsMay 15, 1995+7 daysDec 15, 2005+14 days
F2AMay 8, 2015+23 daysMay 8, 2015+23 daysMay 8, 2015+23 daysApr 22, 2015+21 daysMay 8, 2015+23 days
F2BAug 15, 2010+38 daysAug 15, 2010+38 daysAug 15, 2010+38 daysNov 22, 1995+14 daysMay 1, 2006+23 days
F3Apr 22, 2005+31 daysApr 22, 2005+31 daysApr 22, 2005+31 daysDec 22, 1994+7 daysSep 8, 1994
F4Feb 22, 2004+14 daysFeb 22, 2004+31 daysJul 22, 2003+37 daysJun 1, 1997+10 daysAug 1, 1993+40 days

Family-sponsored, Dates for Filing

An application can be filed, or documents sent to the National Visa Center, for a priority date earlier than the cutoff, when USCIS says this chart may be used.

In the US, USCIS is using this chart for I-485s filed in Mar 2017.

Family-sponsoredAll other countriesChina (mainland born)IndiaMexicoPhilippines
F1Jan 1, 2011Jan 1, 2011Jan 1, 2011Jun 1, 1995May 1, 2006
F2ANov 22, 2015Nov 22, 2015Nov 22, 2015Nov 22, 2015Nov 22, 2015
F2BFeb 8, 2011Feb 8, 2011Feb 8, 2011Jun 1, 1996Feb 1, 2007
F3Aug 22, 2005Aug 22, 2005Aug 22, 2005May 1, 1995Jan 1, 1995
F4Jul 1, 2004Jul 1, 2004May 1, 2004Dec 1, 1997Apr 1, 1994

Employment-based, Final Action Dates

In the US, USCIS is using this chart for I-485s filed in Mar 2017.

Employment-basedAll other countriesChina (mainland born)El Salvador, Guatemala, HondurasIndiaMexicoPhilippines
EB-1CurrentCurrentCurrentCurrentCurrentCurrent
EB-2CurrentDec 15, 2012+30 daysCurrentJun 1, 2008+2 monthsCurrentCurrent
EB-3Dec 1, 2016+2 monthsMar 15, 2014+5 monthsDec 1, 2016+2 monthsMar 22, 2005Dec 1, 2016+2 monthsMar 15, 2012+5 months
EB-3 Other WorkersDec 1, 2016+2 monthsFeb 1, 2006+2 monthsDec 1, 2016+2 monthsMar 22, 2005Dec 1, 2016+2 monthsMar 15, 2012+5 months
EB-4CurrentCurrentJul 15, 2015CurrentJul 15, 2015Current
Certain Religious WorkersCurrentCurrentJul 15, 2015CurrentJul 15, 2015Current
EB-5 non-regional center (C5 and T5)CurrentMay 1, 2014+16 daysCurrentCurrentCurrentCurrent
EB-5 regional center (I5 and R5)CurrentMay 1, 2014+16 daysCurrentCurrentCurrentCurrent

Employment-based, Dates for Filing

In the US, USCIS is using Final Action Dates, not this chart, for I-485s filed in Mar 2017.

Employment-basedAll other countriesChina (mainland born)IndiaMexicoPhilippines
EB-1CurrentCurrentCurrentCurrentCurrent
EB-2CurrentMar 1, 2013Apr 22, 2009CurrentCurrent
EB-3CurrentMay 1, 2014Jul 1, 2005CurrentSep 1, 2013
EB-3 Other WorkersCurrentAug 1, 2009Jul 1, 2005CurrentSep 1, 2013
EB-4CurrentCurrentCurrentCurrentCurrent
Certain Religious WorkersCurrentCurrentCurrentCurrentCurrent
EB-5 non-regional center (C5 and T5)CurrentJun 15, 2014CurrentCurrentCurrent
EB-5 regional center (I5 and R5)CurrentJun 15, 2014CurrentCurrentCurrent

What State had said to expect for this month

The January 2017 bulletin said what to expect for the months ahead in 1 statement whose window, under the rule, reaches the March 2017 bulletin: 0 of 1 with a direction matched over the whole window. The result is for the statement’s whole window, of which this bulletin is one month; the dates under it are what each bulletin in the window printed.

BulletinWhat State saidResult, and what the next bulletins printed
Jan 2017EB-4 rest of world“There continues to be high demand in the E4 and SR categories, primarily for Juvenile Court Dependent cases filed with U.S. Citizenship and Immigration Services for adjustment of status. Therefore, it may be necessary to retrogress the E4 and SR Final Action Dates for El Salvador, Guatemala, Honduras, and Mexico at some point in an effort to hold number use within the maximum allowed under the FY-2017 annual limits.”did not matchFeb 2017: Current; Mar 2017: Current; Apr 2017: CurrentEB-4 rest of world so far: 1 of 2 matched

What State said to expect, and what happened

Under “VISA AVAILABILITY IN THE COMING MONTHS” (page 8), the March 2017 bulletin said what it expected for the months ahead. Each statement is State’s wording; the result applies one written rule to the Final Action cutoffs the next bulletins printed: 14 of 17 statements that named a line and a direction matched what the next bulletins printed. All bulletins and the tally per line.

LineWhat State saidResult, and what the next bulletins printed
F1 rest of world“Up to several months”matchedApr 2017: Oct 15, 2010 (forward from Jun 1, 2010); May 2017: Dec 8, 2010 (forward from Oct 15, 2010); Jun 2017: Dec 22, 2010 (forward from Dec 8, 2010)F1 rest of world so far: 1 of 2 matched
F2A rest of world“Up to one month”did not matchApr 2017: Jun 8, 2015 (forward from May 8, 2015); May 2017: Jul 15, 2015 (forward from Jun 8, 2015); Jun 2017: Aug 15, 2015 (forward from Jul 15, 2015)F2A rest of world so far: 1 of 2 matched
F2B rest of world“Up to five weeks”matchedApr 2017: Sep 15, 2010 (forward from Aug 15, 2010); May 2017: Oct 1, 2010 (forward from Sep 15, 2010); Jun 2017: Oct 22, 2010 (forward from Oct 1, 2010)F2B rest of world so far: 2 of 2 matched
F3 rest of world“Three or four weeks”matchedApr 2017: May 15, 2005 (forward from Apr 22, 2005); May 2017: Jun 15, 2005 (forward from May 15, 2005); Jun 2017: Jul 1, 2005 (forward from Jun 15, 2005)F3 rest of world so far: 2 of 2 matched
F4 rest of world“Two or three weeks”did not matchApr 2017: May 8, 2004 (forward from Feb 22, 2004); May 2017: May 8, 2004; Jun 2017: May 8, 2004F4 rest of world so far: 1 of 2 matched
EB-1 rest of world“The category will remain “Current”.”matchedApr 2017: Current; May 2017: Current; Jun 2017: CurrentEB-1 rest of world so far: 2 of 2 matched
EB-1 China“A Final Action Date is likely to be imposed by August.”matchedApr 2017: Current; May 2017: Current; Jun 2017: Jan 1, 2012 (back from Current); Jul 2017: Jan 1, 2012; Aug 2017: Jan 1, 2012EB-1 China so far: 1 of 1 matched
EB-1 IndiamatchedApr 2017: Current; May 2017: Current; Jun 2017: Jan 1, 2012 (back from Current); Jul 2017: Jan 1, 2012; Aug 2017: Jan 1, 2012EB-1 India so far: 1 of 1 matched
EB-2 rest of world“Current”matchedApr 2017: Current; May 2017: Current; Jun 2017: CurrentEB-2 rest of world so far: 2 of 2 matched
EB-2 China“Up to five weeks.”matchedApr 2017: Jan 15, 2013 (forward from Dec 15, 2012); May 2017: Feb 8, 2013 (forward from Jan 15, 2013); Jun 2017: Mar 1, 2013 (forward from Feb 8, 2013)EB-2 China so far: 1 of 2 matched
EB-2 India“Up to one month.”matchedApr 2017: Jun 22, 2008 (forward from Jun 1, 2008); May 2017: Jun 22, 2008; Jun 2017: Jul 1, 2008 (forward from Jun 22, 2008)EB-2 India so far: 1 of 2 matched
EB-3 rest of world“Up to three months.”matchedApr 2017: Feb 15, 2017 (forward from Dec 1, 2016); May 2017: Mar 15, 2017 (forward from Feb 15, 2017); Jun 2017: Apr 15, 2017 (forward from Mar 15, 2017)EB-3 rest of world so far: 2 of 2 matched
EB-3 China“Up to six months.”matchedApr 2017: Aug 15, 2014 (forward from Mar 15, 2014); May 2017: Oct 1, 2014 (forward from Aug 15, 2014); Jun 2017: Oct 1, 2014EB-3 China so far: 2 of 2 matched
EB-3 India“Extremely limited forward movement.”not scorabletoo vague to check (little or no movement, or too early to say)
EB-3 Mexico“Will remain at the worldwide date.”not scorabletoo vague to check (little or no movement, or too early to say)
EB-3 Philippines“Up to six months.”matchedApr 2017: Sep 15, 2012 (forward from Mar 15, 2012); May 2017: Jan 1, 2013 (forward from Sep 15, 2012); Jun 2017: May 1, 2013 (forward from Jan 1, 2013)EB-3 Philippines so far: 1 of 2 matched
EB-4 rest of world“Current for most countries.”matchedApr 2017: Current; May 2017: Current; Jun 2017: CurrentEB-4 rest of world so far: 2 of 3 matched
EB-4 El Salvador, Guatemala and Honduras“Some movement may be possible during the summer months.”not scorabletoo vague to check (little or no movement, or too early to say)
EB-4 Mexiconot scorabletoo vague to check (little or no movement, or too early to say)
EB-5 unreserved rest of world“The category will remain “Current” for most countries.”matchedApr 2017: Current; May 2017: Current; Jun 2017: CurrentEB-5 unreserved rest of world so far: 2 of 2 matched
EB-5 unreserved China“Up to two weeks.”did not matchApr 2017: May 22, 2014 (forward from May 1, 2014); May 2017: Jun 1, 2014 (forward from May 22, 2014); Jun 2017: Jun 8, 2014 (forward from Jun 1, 2014)EB-5 unreserved China so far: 1 of 2 matched
What the bulletin said about no single line (1 remark, not scored)

Every line: “The above final action date projections for the Family and Employment categories indicate what is likely to happen on a monthly basis through May or June based on current applicant demand patterns. Readers should never assume that recent trends in final action date movements are guaranteed for the future, or that "corrective" action will not be required at some point in an effort to maintain number use within the applicable annual limits. The determination of the actual monthly final action dates is subject to fluctuations in applicant demand and a number of other variables.”

About this page

Every value is the one printed in the March 2017 bulletin, read from the PDF by two programs that agree on every cell and spot-checked by eye; the change in each cell compares it with the Feb 2017 bulletin. Rows the bulletin prints that are not here (the EB-5 infrastructure set-aside in some months) are rows our readers do not yet read. This is not legal advice. Sources and method. Download every month: eb-cutoffs.csv.

Cite this page

Green Card Wait. “March 2017 Visa Bulletin: every cutoff and what moved.” Data as of the March 2017 Visa Bulletin (State PDF sha256 630c423e4ec4). https://www.greencardwait.com/visa-bulletin/march-2017/. Add the date you read it.

@misc{greencardwait-march-2017-visa-bulletin-every-c-2017-03,
  author = {Green Card Wait},
  title = {March 2017 Visa Bulletin: every cutoff and what moved},
  howpublished = {\url{https://www.greencardwait.com/visa-bulletin/march-2017/}},
  year = {2017},
  note = {Data as of the March 2017 Visa Bulletin (State PDF sha256 630c423e4ec4); add the access date as urldate}
}

The cutoffs are the Department of State’s: cite the bulletin itself for a cutoff and this page for the compilation, the movement arithmetic and the checks. Corrections lists anything that was live and wrong.